2012 Melting machine

2012 Melting machine

Contact us for price

Location:Cologne, Germany

Description

Melting machine- preparation and storage (From a Plant for fire aluminizing steel wire)

The furnace for melt preparation is an electrically heated crucible furnace. Ingots of an aluminium master alloy are melted beforehand in the crucible furnace, melting temperature 750°C.


The molten aluminium is processed before being fed into the actual melting and holding furnace

Processing is carried out using an impeller device, degassing of the melt, degassing agent argon gas.

Slag is separated and bound by adding further agents such as flux to the melt. The separated slag is skimmed off using a ladle.

The prepared melt is transferred to the melting and holding furnace via the charging funnel using a ladle.


Alternatively, if the technological requirements are met, the melt is pumped from the melting furnace into the holding furnace by a pump.

The holding and dosing furnace is heated electrically. (The detailed description can be found in the manufacturer's technical documentation).

The furnace is fed via a so-called feed hopper The feed hopper extends into the melt of the dosing furnace


The dosing furnace is permanently covered with nitrogen gas to prevent oxidation of the melt. The dosing furnace is tightly closed during operation.

The front furnace flap can be opened to clean the melt.

The dosing furnace is tightly connected to the coating chamber by a detachable flange connection. Liquid melt is pressed into the coating chamber through a riser pipe which reaches into the melt of the dosing furnace. This occurs as follows: nitrogen gas enters the furnace chamber above the melt through an electro-pneumatic control valve, a preset overpressure is built up in the furnace chamber (the furnace diagram can be found in the manufacturer's technical documentation).


The inner chamber pressure is monitored and scanned via pressure sensors. In the event of overpressure, 2 renundant safety valves open.

The fill level of the melt is monitored by 2 laser sensors. ( The detailed functional description of the sensors can be found in the manufacturer's technical documentation )


The coating chamber is emptied by reducing the overpressure in the furnace interior by closing the electropneumatic control valve and simultaneously opening a shut-off valve, the entire nitrogen control line and the furnace interior is thus depressurised.




Find more here - https://www.ucymachines.com/


Contact us at - sales@ucymachines.com

Specifications

ManufacturerMelting machine
Year2012
ConditionUsed
Stock Number82